Russian NC  >  Youth Section

INTERNATIONAL STUDENT COMPETITION ON ELECTRICAL POWER ENGINEERING

INTERNATIONAL STUDENT COMPETITION ON ELECTRICAL POWER ENGINEERING,

18-22 November 2014, Ivanovo, Russia

Ivanovo State Power Engineering University (ISPEU) and Charitable foundation «Reliable Rising Generation» in accordance with the plan of joint arrangements for the year of 2014 with the support of Joint-stock Company “System Operator of the United Power System”, JSC "Territorial Generating Company #2", JSC "Schneider Electric" and Russian National Committee of International Council on Large Electric Systems (CIGRE RNC) hold the International Student Competition on Electrical Power Engineering among the students of electrical and electrical power engineering programs of study.

The aim

Improving the quality of students’ preparation of Electrical and Electrical Power Engineering programs of study, increasing students’ interest for their profession, finding out talented young people and forming personnel potential to organize research, project and administrative production activity.

Timing of the Competition: the Competition is held 18-22 November, 2014.

Preliminary program of the competition

November 18  arrival and registration of the participants;

November 19 the Competition holding;

November 20  checking up of the works, a round table with representatives of JSC "SO UPS"

November 21-22 the winners’ awarding during the Youth Forum ENES 2014 and excursion

The working languages of the Competition: Russian, English, French

The place of the Competition

Lecture-rooms in ISPEU (34, Rabfakovskaya Str., Ivanovo, Russia).

Staying: ISPEU and Ivanovo hotels.

The terms of the Competition

The participants of a team are full-time graduate and 1st and 2nd year Master's Degree Students whose programs of study are Electrical Power Engineering and Electrical Engineering. The Competition has the individual and the team championship. The number of the participants from every higher educational institution is not more than 7 students. Number of teams is not limited. Total number of points in team championship is a sum of four best student points. The team is represented by a leader who is a teacher or a staff member of a higher educational institution. The leader is the member of the jury of the Competition.

The Competition tasks may be the ones prepared by the teachers of the electrical engineering of higher educational institutions, which take part in the Competition.. The tasks to be included in the list of the Competition tasks, with the decisions should be sent to e-mail: cigre@ispu.ru no later than November 1, 2014.

In order to take part in the Competition it is necessary to fill in the application form and send it on e-mail: cigre@ispu.ru no later than October 15, 2014. Each participant must have a passport, student’s card (or academic record book), calculator, pen

The participation in the Competition is confirmed with the application form on the higher educational institution note-paper certified by a person in charge and the seal of the institution (it may be sent by mail or taken to the organizational committee by the team leader) and its copy must be send to e-mail cigre@ispu.ru. The participation in the Competition is free. To reserve the hotel it is necessary to send the application form before October 15, 2014. Excursion to energy efficient electricity facility is included to the Competition. The winners and participants are awarded with the diplomas, presents and are included in the personnel reserve of electric facilities.

Tasks subjects

There wiil be 12 tasks of different difficulty levels in the following disciplines:

  • Theoretical Basics of Electrical Engineering
  • High-Voltage Engineering
  • Relay Protection and Automation
  • Electric Power Stations' and Substations' Electrical Equipment
  • Electric Systems and Nets
  • Electric Power Supply

Important dates

1.

The application form for taking part in the Competition

deadline 15.10.2014

2.

The application form for hotel reservation

deadline 15.10.2014

3.

Tasks from other higher educational institutions

deadline 1.11.2014

4.

The Competition holding

18-19 November 2014

5.

Students meeting with the employers*

20 November 2014

6.

Rewarding of the Competition winners at the youth forum ENES 2014 in Moscow 

21-22 November 2014

* During the Competition will take place a round table with the leaders of power-system protection and electric modes technological services of JSC "SO UPS" from cities:  Khabarovsk (Khabarovsk Regional Dispatch Administration (RDA)), Vladivostok (Primorsk RDA), Perm (Perm RDA), Surgut (Tyumen RDA), Chita (Transbaical RDA), Novgorod (Novgorod RDA), Petrozavodsk (Karelian RDA), town Murmashi in the Murmansk Region, (Kola Peninsula RDA),          Syktyvkar (Komi RDA). During the round table the students will learn about employment opportunities at the branches of JSC "SO UPS" and gain practical training in them. For this participants of the Competition must complete and send us the form together with the application (see Appendix).

THE ORGANIZATIONAL COMMITTEE

Vladimir Tutikovthe chairman of organizational committee of the Competition, the vice-rector of ISPEU.

Andrey Gofmanthe vice-chairman, the leader of the organizational committee of Youth Section of CIGRE Russian National Committee

Arkady Makarov,  Head of the Students' scientific research and talented students department of Ivanovo State Power Engineering University, Coordinator of RNC CIGRE Youth Section, ph. (4932) 269-945, +7-920-671-45-37, e-mail: nirs@ispu.ru

Timophey Shadrikov, coordinator of the Competition, ph. +7-910-992-68-69, e-mail: cigre@ispu.ru, 34, Rabfakovskaya street, Ivanovo, Russia. 153003

Operational information about the competition is posted on the website of the university: http://ispu.ru/node/13034 and RNC CIGRE website http://www.cigre.ru/rnk/youth/news_868/  (informational notices, the Competition rules of procedure, the themes and examples of tasks, routes to academic buildings and campus ISPU and hotels, etc). The Organizational Committee reserves the right to make minor changes in the program of the Competition.

Public information notice #1 - link.

Public information notice #2 - link.

Tasks subject - link.

Previous years tasks - 2013.

Latest News

Season Greetings 2021 from CIGRE Russia

Season Greetings 2021 from CIGRE Russia Chairman Andrey E. Murov.

More

Electrical Power Systems Development — Balance of Physics and Market Mechanisms Based on Innovative Technologies

On July 20, 2021, a video conference was organized by the “ELECTRIC POWER. Transmission and Distribution” journal with the support of CIGRE Russian National Committee. During the video conference representatives of the publishing company took an exclusive interview with Michel AUGONNET, CIGRE President.

More

At the NGN Forum Russia has presented the structure of the online platform aimed at international scientific cooperation between students - young engineers and companies

The key topics discussed at the NGN Forum organized on the 23rd of August by NGN Russia were the following: contribution of young professionals in the future of power grids; direction of companies’ development and industry expert cooperation of global network in order to integrate ideas and young professionals potential; successful experience of inclusion of young people in the CIGRE Study Committee’s activity.

More

In the Russian Electric Power Industry, 36% of Employees Are Women, Which Is One of the Best Indicators in the World, Anastasia Bondarenko Stated at the CIGRE Forum “Women in Energy”

Anastasia Bondarenko, the State Secretary–Deputy Minister of Energy of the Russian Federation, spoke as a key speaker at the V International Forum “Women in Energy” within the framework of the 48th Anniversary Session of the International Council on Large Electric Systems of High Voltage (CIGRE), where she presented the results of the all-Russian study of the structure of women employment in the electric power industry and of the existing support measures for female labor and motherhood.

More

Useful Links

Contact Us


Contacts

E-CIGRE


E-CIGRE